I would hardly consider IOG a major. A tiny Oz micro like FPL
some 22 wells for 55bbls per day. in end, walked away
HZ1 was a horizontal into Niobrara. A 5000ft lateral from memory.
It sat there for 5 years, after IP of around 400.
It's never made a dime back and cost around US$5m.
Gas processing is the issue here. They are only trying to permit the pipeline after 5 years of HZ1 gas. permitting will not be easy through these farms/property. Elk country etc
There is uneconomical gas everywhere on property so far.
30 day IP lucky to be 100.
$70m + smoked out of this bbq for a $7m cap.
They'll never make it back..
punters stock.
good DT one when it comes. ask all the last fellas here pumping it - its like a revolving door. with BEV as doorman lol
FPL Price at posting:
0.8¢ Sentiment: Sell Disclosure: Not Held