i believe testing of the stock pile is underway by the Germans which should not be too much of a problem as the stockpile actually has an issued JORC over it.
results should be done circa Aus Day...legals are hopefully being run in tandem to mitigate timeframes slipping.
all other things being equal and test results being positive...by mid Feb we should be well and truly in lift off mode!
my thoughts only...