Calculations for the initial resource estimate were based on identifying SOP in the basal sands only.
Subsequent to drilling and beyond expectations we discovered up layer sands of significant widths and grades, confirmed through assays.
Given this, the specific maiden resource estimate should comfortably come in at the north end no?
- Forums
- ASX - By Stock
- APC
- Ann: Final assays highlight quality and scale of SOP Project-GPH.AX
Ann: Final assays highlight quality and scale of SOP Project-GPH.AX, page-17
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add APC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.070M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $1.12K | 1.12M |
Featured News
APC (ASX) Chart |
Day chart unavailable