Final assays expand Kathleen Valley lithium deposit ahead of maiden Resource Drilling extends strike and dip extent of high-grade mineralisation with all results to be included in a maiden Resource estimate scheduled for late August
HIGHLIGHTS Latest results include widest mineralised interval intersected to date at Kathleen’s Corner: Other results include: (True widths 85-95% of down-hole widths listed above) Continuous mineralisation at the main Kathleen’s Corner prospect has now been defined over a strike length of 1,100m and down-dip extent of 800m. Mineralisation remains open both along strike and at depth. Geological modelling indicates a total 19 mineralised pegmatites. Maiden Resource estimate scheduled for completion by end of August 2018. Liontown Resources Limited (ASX: LTR) is pleased to advise that recently completed resource drilling has continued to expand the high-grade mineralisation at its 100%-owned Kathleen Valley Lithium Project, 680km north-east of Perth in WA, with work now underway on a maiden Resource estimate The latest results will be incorporated into a geological model of the mineralisation which independent mining consultants, Optiro Pty Ltd, will use to prepare the Resource estimate, scheduled for completion by the end of August 2018. o 39m @ 1.3% Li2O from 99m (KVRC0122), including: 6m @ 2.5% Li2O from 100m; and 5m @ 1.7% Li2O from 108m; and 5m @ 1.9% Li2O from 127m o 12m @ 1.8% Li2O from 113m (KVRC0123), including: 6m @ 2.5% Li2O from 118m o 16m @ 1.4% Li2O from 93m (KVRC0124), including: 6m @ 2.1% Li2O from 100m o 14m @ 1.6% Li2O from 38m (KVDD0006), including: 7m @ 1.9% Li2O from 43m o 12m @ 1.4% Li2O from 86m (KVRC0129), including: 6m @ 1.9% Li2O from 91m o 12m @ 1.2% Li2O from 175m (KVRC0131), including: 4m @ 2.1% Li2O from 175m o 9m @ 1.7% Li2O from 86m (KVRC0134), including 5m @ 2.3% Li2O from 88m
Continuous mineralisation at the main Kathleen’s Corner prospect has now been defined over a strike length of 1,100m and down-dip extent of 800m. Mineralisation remains open both along strike and at depth. Geological modelling indicates a total 19 mineralised pegmatites. Maiden Resource estimate scheduled for completion by end of August 2018. Liontown Resources Limited (ASX: LTR) is pleased to advise that recently completed resource drilling has continued to expand the high-grade mineralisation at its 100%-owned Kathleen Valley Lithium Project, 680km north-east of Perth in WA, with work now underway on a maiden Resource estimate The latest results will be incorporated into a geological model of the mineralisation which independent mining consultants, Optiro Pty Ltd, will use to prepare the Resource estimate, scheduled for completion by the end of August 2018.
- Forums
- ASX - By Stock
- Ann: Final assays expand Kathleen Valley lithium deposit
Final assays expand Kathleen Valley lithium deposit ahead of...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
84.5¢ |
Change
-0.010(1.17%) |
Mkt cap ! $1.612B |
Open | High | Low | Value | Volume |
85.0¢ | 86.5¢ | 83.5¢ | $5.151M | 6.083M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 23487 | 84.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
85.0¢ | 286512 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
10 | 1641167 | 0.019 |
3 | 712500 | 0.018 |
3 | 794117 | 0.017 |
1 | 200000 | 0.015 |
1 | 60000 | 0.014 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 1985261 | 1 |
0.021 | 1256198 | 4 |
0.022 | 1128862 | 5 |
0.023 | 1750000 | 3 |
0.024 | 480229 | 3 |
Last trade - 16.10pm 18/11/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |