I have come round to your way of thinking we can support bigger production why not go for it, but still either way, at this point we are under $20mill cap any production will see us at multiples of the current price.
So hopefully we get to production first then announce a plan to increase it, thats basically the same thing with a whole lot less risk and effort, it's just evaporation ponds and pumps right? that can be added on later.
As for todays ann good stuff the take up $4mill with the price under 10% premium most of the time, thats solid not likely many pip traders in there, obviously progress slowed alittle while they were waiting for $ I expect they will be chomping to ramp things up and we should see a little churn followed by a big run into December.
24cents is the number I want to see lets go get it.
- Forums
- ASX - By Stock
- APC
- Ann: Field Progress Update-GPH.AX
Ann: Field Progress Update-GPH.AX, page-4
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add APC (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.070M |
Open | High | Low | Value | Volume |
0.1¢ | 0.1¢ | 0.1¢ | $1.12K | 1.12M |
APC (ASX) Chart |
Day chart unavailable