If you look at jhonwalkmans posts his claiming that company with a stellar history off missing timeslines is only about 6 months or pushed back on stage 2.
Interesting opinion, it's nice what was that word he was teaching us the one that's ok to say
“optimism, n. The doctrine, or belief, that everything is beautiful, including what is ugly, everything good, especially the bad, and everything right that is wrong. It is held with greatest tenacity by those most accustomed to the mischance of falling into adversity, and is most acceptably expounded with disproof - an intellectual disorder, yielding to no treatment but death. It is hereditary, but fortunately not contagious."
It's nice that his so optimistic for others, just not A40 only doom and gloom for us, with our strong history of doing thing on time and on budget.
Just one thing would that be 6 months late, from now which is already 5 months late or is another 6 months in addition to the 5 months they are already behind now?
Interesting 6 months to secure financing and kick off the 18 month process to double production, in my opinion I think it's more likely to be 6 years than 6 months, but ofcourse just my humble opinion.
Glad to see all that happening is no risk, but A40 simply ramping up a built plant is a massive huge unbelievable risky endeavor fraught with danger and risk.