no one is going to tip in fresh equity when the (new) con note holders' interests rank are secured against the assets and undertakings of the business (as is standard fare).
Hence, the $10m equity CR is just total unalduterated huff imho.
Shame we have no idea on the operational aspects of the business.
- Forums
- ASX - By Stock
- Ann: Extension of time to hold AGM
no one is going to tip in fresh equity when the (new) con note...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CTL (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.0¢ |
Change
0.000(0.00%) |
Mkt cap ! n/a |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CTL (ASX) Chart |
Day chart unavailable