Charlie:
The Wombat wells were to be put into production back in 2013 in a $50 million joint venture with BPT. As Roland Sleeman has said LKO was on the cusp of production when the moratorium was extended to include all onshore gas exploration. I suggest you give Roland Sleeman a ring....LKO are not expecting any compensation....they want to drill the two Otway wells and put the Wombat fields into production.
- Forums
- ASX - By Stock
- Ann: Extension of Entitlement Offer
Charlie:The Wombat wells were to be put into production back in...
-
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add LKO (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.00 |
Change
0.000(0.00%) |
Mkt cap ! $58.8K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
LKO (ASX) Chart |
Day chart unavailable