I understand there could have been an issue with the environmental bond...and the magnitude of what the SA govt was after. Early indications were minimal in DD for the asset however once ROG signed the deal govt turned around and quadrupled what they initially advised.
came from an industry consultant in SA who knew the asset and parts of the transaction...I have no ability to know if it is accurate and as such is only hearsay as I cant verify.
it might paint some of the picture of the delay in finalizing...
please dyor. I am a long term holder btw.
- Forums
- ASX - By Stock
- Ann: Ext. to Acquire Innamincka Dome Project from Beach Energy
I understand there could have been an issue with the...
-
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ROG (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
-0.001(6.25%) |
Mkt cap ! $32.53M |
Open | High | Low | Value | Volume |
0.8¢ | 0.8¢ | 0.8¢ | $152.6K | 19.09M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
25 | 39136118 | 0.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 12271685 | 16 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
20 | 23393673 | 0.002 |
28 | 92682599 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 989929 | 2 |
0.004 | 39011968 | 15 |
0.005 | 19447740 | 8 |
0.006 | 8100000 | 4 |
0.007 | 6550000 | 3 |
Last trade - 13.14pm 08/11/2024 (20 minute delay) ? |
ROG (ASX) Chart |