Maybe in this case rather than thinking of slag as waste instead think of the slag as analogous to tailings that had lower than expected recoveries when first processed and the reprocessing extracts more PGMs .
Would be nice to see a high recovery full hydrometallurgical process route rather than having to smelter , however for this hydromet is only around 20% recovery compared to pyromet currently .
"You haven’t got anything right on Da Vinci, it’s a narrow, steeply dipping"
I would rather steeply dipping (dyke) than a flat/inclined ore body far easier to mine the panels between levels no scrapers needed , and narrow is ok if it has the the grade , which it has , does lack OVM but is close to existing drives
Drill hole results have come in as my model predicted , sp increase over the last year is indicative I am right
BBX Price at posting:
15.5¢ Sentiment: Buy Disclosure: Held