Drilling seems to be very slow or they have encountered more problems as the average drilling rate is 30m per shift. Assuming 1 shift they should have hit the target 2 days ago. I'm hoping rock is tougher than normal and causing a slower rate of progress. Fingers crossed they hit the spot and it's MS.
Hoping for something positive tomorrow.