Road construction and preparation of drill pads have been completed at Tommy?s Gap. A Schramm RC drill rig is now on site and the first drill hole has been collared in today.
KARINGA CREEK POTASH
Drilling with the Schramm RC drill rig was suspended due to sticky clays making drilling ineffective. The air core rig designated for Ammaroo will now be utilized at Karinga once the final NT Mines Department clearance is received and drilling at Ammaroo can proceed.
RWD Price at posting:
41.8¢ Sentiment: None Disclosure: Not Held