Flagged capex for pumping operation was $75-$100mill in previous presentations.
Production costs around $250/ton was what current successful producer churn it out for.
I haven't compared to SO4 yet, but so surface on the surface well below my expectations.
That said Macap is still low and hartleys control the free float they could run it 100% in the next week with little effort.