The whole point of DSO concentrate is the capex is nothing like KRC. The expensive part of the refinery is deferred to stage 2 - or never .
Let the market decide if it likes the 200 Meter intersections if Airjoki or these fantastic concentrate levels . The scoping study will give all the negative nannies some clarification.
Until then they can just watch what others make of it.
The operational benefits of close infrastructure and cheap power will add interest to any downstream processing.
- Forums
- ASX - By Stock
- Ann: Exceptional Vanadium Grades Confirmed at Koitelainen Vosa
The whole point of DSO concentrate is the capex is nothing like...
-
- There are more pages in this discussion • 107 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add PUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.2¢ |
Change
-0.001(20.0%) |
Mkt cap ! $7.270M |
Open | High | Low | Value | Volume |
0.2¢ | 0.3¢ | 0.2¢ | $8.573K | 3.786M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
54 | 55488336 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 15705345 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 211170 | 0.025 |
3 | 274000 | 0.024 |
4 | 1346362 | 0.023 |
3 | 2445000 | 0.022 |
6 | 1690080 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 100000 | 1 |
0.027 | 500000 | 3 |
0.028 | 265829 | 2 |
0.029 | 337994 | 3 |
0.030 | 707095 | 3 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
PUR (ASX) Chart |