Wow,the rocket launching is counting now.
What impressed me the most the that compare with the scope study, pre-production capital expenditure and lead direct cash cost of production have some slightly increase. It demonstrates that the cost projections are really robust to some ranges of disturbance. When the scoping study was published,some poster questioned that expenditure projections,in my opinion,this PFS should dust any of the doubts on it.
Congratulations to shareholders
- Forums
- ASX - By Stock
- G1A
- Ann: Excellent PFS for Galena's Abra Project and Maiden Reserve
Ann: Excellent PFS for Galena's Abra Project and Maiden Reserve, page-8
-
- There are more pages in this discussion • 37 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add G1A (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $44.40M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
G1A (ASX) Chart |
Day chart unavailable