This one is setting up really nicely. Based off how long it took to get rigs on site post the 4 week public review period at T3 dome I reckon early November the rigs will be at T4 - depending on availability of rigs and success at T3 dome (I thought they previously said T23 was first priority?). I also see historically MOD have continued to drill over the Nov-Jan period even though it has been flagged by those on the ground in Botswana as being the wet season - nothing will stop us now.
I enjoyed this bit - “6 rigs are now operating at the A4 dome with assay results awaited from several significant intercepts”.