Thanks for the embedded video happytrader2015, it really takes me back. What also takes me back was my actual experience drilling nickel systems that were in the 0.5% assay grade stage. 2% in 100% massive or 25% sulphides = 0.5% is the same material. So yeah, if you hit massive it's going to grade 2%. Which is....not high grade.
I also vaguely remember seeing some hydromet announcement out of these guys. At that, I'd walk away. Hydrometallurgy won't polish a turd.
- Forums
- ASX - By Stock
- GBR
- Ann: Eastern Mafic Taking Shape at Mt Venn Copper-Nickel Project
Ann: Eastern Mafic Taking Shape at Mt Venn Copper-Nickel Project, page-28
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $29.16M |
Open | High | Low | Value | Volume |
4.3¢ | 4.3¢ | 4.2¢ | $26.38K | 617.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 85000 | 4.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.4¢ | 618609 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5000 | 0.125 |
2 | 80109 | 0.110 |
1 | 10000 | 0.100 |
1 | 18000 | 0.094 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.135 | 78649 | 2 |
0.140 | 142666 | 2 |
0.145 | 56811 | 2 |
0.150 | 35382 | 3 |
0.155 | 32258 | 1 |
Last trade - 16.10pm 02/12/2024 (20 minute delay) ? |
Featured News
GBR (ASX) Chart |