If they think the assays are not giving correct figures because the drilling could be missing the big crystals.
Why don't they do a mini operation by picking a few spots of 10k tons or whatever tonnage is required and send them off, see what comes back. The rail is right there.
Maybe more practical than just theory work is required.
- Forums
- ASX - By Stock
- Ann: Early Success in Field Mapping Program at Seymour Lake
If they think the assays are not giving correct figures because...
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add ADV (ASX) to my watchlist
(20min delay)
|
|||||
Last
13.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $8.439M |
Open | High | Low | Value | Volume |
13.0¢ | 13.0¢ | 13.0¢ | $8 | 58 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 26918 | 13.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 71428 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 3201255 | 0.003 |
21 | 33473529 | 0.002 |
10 | 17528549 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.004 | 12395196 | 16 |
0.005 | 6855445 | 11 |
0.006 | 6847500 | 13 |
0.007 | 3792287 | 8 |
0.008 | 6107932 | 8 |
Last trade - 14.54pm 29/11/2024 (20 minute delay) ? |
ADV (ASX) Chart |