I have been amusing myself / playing around with Sentinel hub. Nothing groundbraking to share other than it is a fun tool to play around with!
Pics below of drill hole number 2 being built right on CSMAT line number 4. Note the camp is on the right hand side of the river (the road leading up to the white dot).
No evidence so far of where drill hole number 3 will be but will keep looking for evidence a new road being built north of drill hole number 2.
I suspect that it will be on the right hand side of the river because if they were going to drill on the left hand side of the river, I would have thought it would be easier for them to move the heavy machinery straight up and I would expect them to continue building a road from drill hole number 2 and there is no evidence of that so far.
- Forums
- ASX - By Stock
- Ann: Drilling Update
I have been amusing myself / playing around with Sentinel hub....
-
- There are more pages in this discussion • 53 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add GLN (ASX) to my watchlist
(20min delay)
|
|||||
Last
14.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $60.50M |
Open | High | Low | Value | Volume |
14.0¢ | 14.5¢ | 13.5¢ | $232.3K | 1.669M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
23 | 2178553 | 13.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
14.0¢ | 746751 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 50000 | 0.115 |
7 | 472031 | 0.110 |
11 | 947628 | 0.105 |
25 | 1490999 | 0.100 |
2 | 20000 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 1573785 | 9 |
0.130 | 254710 | 7 |
0.135 | 293280 | 3 |
0.140 | 225541 | 3 |
0.145 | 344396 | 6 |
Last trade - 16.10pm 22/11/2024 (20 minute delay) ? |
GLN (ASX) Chart |