Every reason to sell is right here the met work on this project is ass, complete ass they sampled high grade zones and it's all refractory, this project is limited to oxide ounces only maybe a patch work quilt of 500koz at best if everything drills well.
View attachment 766599
7 g/t sample with 69% recovery excuse me while I go throw up cause thats disgustingly bad.
This project major flaws
1.Met work is terrible sulphide ore is all refractory.
2.Refractory ore very expensive to process.
3.High grade results cherry picked for testing, overall grades much lower real results much worse
4.Patch work quilt of ounces expensive to miner lots of stripping.
5.Oxide zone too small for Africa need 3Moz to be make a production push, likely only 500koz.
This project is living on borrowed time.