• The Company has planned up to 1,200m RC drilling in consultation with Newexco to test the target next month. Drilling will be scheduled around the ongoing Yandal West drilling, which remains a priority.
So they can afford both while maintaining focus.
Of more interest if anyone can comment is whatever analysis techniques Newexco use, they originally “identified the shallow gravity anomaly that is interpreted to be a copper VMS target” but now “The Company believes the Chisel gravity target may represent Proterozoic sediment hosted base metal mineralisation (zinc-lead-silver)” which suggests to me significant information has caused this shift in thinking.
- Forums
- ASX - By Stock
- Ann: Drilling Planned for Large Base Metal Target at Chisel
• The Company has planned up to 1,200m RC drilling in...
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add GTE (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.35M |
Open | High | Low | Value | Volume |
2.8¢ | 2.9¢ | 2.8¢ | $13.07K | 465.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 186243 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 19948 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 3055535 | 0.004 |
22 | 13685797 | 0.003 |
6 | 5650000 | 0.002 |
9 | 8500499 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1660000 | 4 |
0.006 | 1000000 | 1 |
0.007 | 502750 | 2 |
0.008 | 750000 | 1 |
0.009 | 708333 | 2 |
Last trade - 15.57pm 15/11/2024 (20 minute delay) ? |
GTE (ASX) Chart |