Yes, i understand that but my point is highlighted in yellow.
Shales cast doubt on EM as an exploration tool ...
Gravity and seismic surveys considered too broad based to generate drill targets ...
Previous geochemical work failed to yield base metal targets ... and
Three RC holes totaling over 600m failed to return any significant base metal assays.
I'm just saying that based on previous work i'm not expecting anything here and am much more interested in Yandal West. I would rather the money be spent there ...
Perdy
- Forums
- ASX - By Stock
- GTE
- Ann: Drilling Planned for Large Base Metal Target at Chisel
Ann: Drilling Planned for Large Base Metal Target at Chisel, page-28
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add GTE (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $14.35M |
Open | High | Low | Value | Volume |
2.8¢ | 2.9¢ | 2.8¢ | $13.07K | 465.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 186243 | 2.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.9¢ | 19948 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 3055535 | 0.004 |
22 | 13685797 | 0.003 |
6 | 5650000 | 0.002 |
9 | 8500499 | 0.001 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 1660000 | 4 |
0.006 | 1000000 | 1 |
0.007 | 502750 | 2 |
0.008 | 750000 | 1 |
0.009 | 708333 | 2 |
Last trade - 15.57pm 15/11/2024 (20 minute delay) ? |
GTE (ASX) Chart |