Langi Logan drilling results should be coming very soon I guess.
It's 7 weeks after that first LL assay results anns. and the 2/3 of results are due.
On Dec.11 2018, we only received assay results for the first 15 of 22 AC holes drilled totalling approximately 2,000m of a planned 4,000m drilling program. That means we only received 1/3 of the results.
- Forums
- ASX - By Stock
- Ann: Drilling expands gold at depth at Adventure Lode
Langi Logan drilling results should be coming very soon I...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)