A Phase 1 drilling program comprising 25,000m of AC, 6,000m of RC and 1,500m of DD is scheduled to be completed by the end of January 2018 at an estimated cost of $3.5 million.
Can't wait for the results of these drill holes! Hopefully some exciting times ahead.
GLTAH