Drilling commenced 8th Dec. 1200m of drilling is planned in 10-12 holes. Scheduled to be completed prior to Xmas, with the results due in early February 2017. Hope the wet weather has not delayed progress. Looking forward to the results.
kippax
- Forums
- ASX - By Stock
- Ann: Drilling commenced at Bygoo
Drilling commenced 8th Dec. 1200m of drilling is planned in...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add TMZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $4.881M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
TMZ (ASX) Chart |
Day chart unavailable