probably the most important point here was "project economics are likely to be significantly enhanced compared to the 2016 Pre-Feasibility Study results"
no comment on timing of BFS though, hard to believe they could get the timing so wrong. Must submit mining licence application in April and assume this needs to include key aspects of the BFS. Running out of time but I suspect they will make it by the finest of margins
PDZ Price at posting:
68.5¢ Sentiment: Buy Disclosure: Held