Getting the downhole EM done depends on crew availability. Best case, 2 days for survey and interpreted results if the crew is sitting beside the drill ready to go. Worst case, a couple of weeks if the crews are all in Mt Isa or somewhere. But with sulphides being obvious, and hand held portable XRF units able to give on the spot point nickel-copper analysis, then they should know whether they have the bull by the horns as soon as it comes out of the drill tube. Then it becomes a matter of how big as the borehole EM guides future drilling to find the best stuff.