AUR 0.00% 0.7¢ auris minerals limited

Drilling weathered rock with diamond is always slower,...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 3,055 Posts.
    lightbulb Created with Sketch. 166
    Drilling weathered rock with diamond is always slower, especially if you are going for triple tube and trying to get structure. 40m per day or 20m a shift is way optimistic, more like 8-12m a shift in really grotty saprolite. If they have swelling clays, you can lose 1-5 days waiting for the potassium salts to get sourced from the depot and getting the mud mixture right to stop the core blowing apart is an art.

    I have seen holes around Horseshoe/Cassidy that were completely weathered to 300m down hole. At Sipa's Enigma, 430m below surface. So it's not unknown for weathering to be exceptionally deep in these Prot rocks, but I'd expect the usual to be 100-120m down hole. Full fresh (AKA Top Of Fresh Rock or TOFR) in this part of the world is up to 150m down hole in altered volcanics.

    So, probably 7-9 days of drilling, then they have to log the hole (2-4 days on that), cut it (1 day) hotshot to the lab (1 day) and assay (7 days minimum). 14-18 days.
 
watchlist Created with Sketch. Add AUR (ASX) to my watchlist
(20min delay)
Last
0.7¢
Change
0.000(0.00%)
Mkt cap ! $2.383M
Open High Low Value Volume
0.6¢ 0.7¢ 0.6¢ $14.8K 2.460M

Buyers (Bids)

No. Vol. Price($)
2 811638 0.6¢
 

Sellers (Offers)

Price($) Vol. No.
0.7¢ 736892 4
View Market Depth
Last trade - 16.10pm 14/11/2024 (20 minute delay) ?
AUR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.