Welp. Cutting half the holes off the program is not a good sign. I think the DDH is a fishing expedition to use DHEM to give them a better idea of where the sulphides are going. Judging by the depths, and the planned depth of the new DDH, they are going for 100m or less vertical separation from hole 5, to use it as a new platform for DHEM.
So i don't think their plunge projection is based on much. When you have 5 holes on a long section, and almost nothing is in fresh, and you're dealing with squeezed-out sulphides in a fold, it's no surprise they are struggling to pin down exactly what the plunge is or where the sulphides have been squeezed.
- Forums
- ASX - By Stock
- Ann: Diamond Drilling to Commence at Wodger
Welp. Cutting half the holes off the program is not a good sign....
-
- There are more pages in this discussion • 108 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.6¢ |
Change
-0.001(14.3%) |
Mkt cap ! $2.383M |
Open | High | Low | Value | Volume |
0.6¢ | 0.6¢ | 0.6¢ | $14.54K | 2.424M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 826354 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.7¢ | 772898 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 103729 | 0.030 |
1 | 218636 | 0.028 |
1 | 300000 | 0.024 |
2 | 200000 | 0.022 |
1 | 100000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 20000 | 1 |
0.034 | 194955 | 1 |
0.035 | 665000 | 1 |
0.036 | 58747 | 1 |
0.039 | 82835 | 1 |
Last trade - 13.02pm 14/11/2024 (20 minute delay) ? |
AUR (ASX) Chart |