Yes indeed - 10 planned holes and only 5 were drilled. That should mean that they identified what they were looking for without doing the complete programme. That has to be a very positive sign.
Holes 6,7,8 and 9 may have done the geometric work, and seeing that 3 of those 4 were shorter than RC5 (the other was only 12ms longer) nothing other than oxide mineralisation would have been expected I'd say.
Hole 10 is the interesting one. It would have been the last hole drilled and it was far the deepest at 375ms. They stopped there! It may have some nice assays!
- Forums
- ASX - By Stock
- Ann: Diamond Drilling to Commence at Wodger
Yes indeed - 10 planned holes and only 5 were drilled. That...
-
-
- There are more pages in this discussion • 113 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add AUR (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.383M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1337500 | 0.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.8¢ | 393286 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 103729 | 0.030 |
1 | 218636 | 0.028 |
1 | 300000 | 0.024 |
2 | 200000 | 0.022 |
1 | 100000 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.031 | 20000 | 1 |
0.034 | 194955 | 1 |
0.035 | 665000 | 1 |
0.036 | 58747 | 1 |
0.039 | 82835 | 1 |
Last trade - 16.12pm 27/11/2024 (20 minute delay) ? |
AUR (ASX) Chart |
Day chart unavailable