re: Ann: Development Update for Snake River M... The 6 wells awaiting to be tied in appear to be 1 X SWD and 5 X production. Tie in will happen during November it seems. Given a few days for clean up, its likely the fruits of this will only hit for the December production figures. Conceivably this could be around 400BOEPD coming online in one hit but we have to wait a few weeks to see it. Looks like they will meet their 1000 boepd exit rate.
Sept Production looks to be the approx the same as August - it does not appear they have added to producing wells
Second rig looks to be in the bag. Also perhaps increased drill rate per rig. At 10 days per well, 2 rigs can do 18 wells per quarter. Triple the rate of our 6 per quarter (currently), and probably more efficient since rig transport and set up will be minimised.
- Forums
- ASX - By Stock
- Ann: Development Update for Snake River Mississip
re: Ann: Development Update for Snake River M... The 6 wells...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AOK (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.833M |
Open | High | Low | Value | Volume |
0.3¢ | 0.3¢ | 0.3¢ | $21.46K | 7.155M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
10 | 20533665 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 10674288 | 5 |
Last trade - 13.35pm 15/11/2024 (20 minute delay) ? |
Featured News
AOK (ASX) Chart |
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online