“Protean on track to commence deployment of a demonstration wave farm at the Port of Bunbury, Western Australia, during April 2016”
“… up to 30 Protean wave energy converter buoys …”
“… trial period of up to 6 months …”
“… key step in the commercialisation process of the Protean wave energy converter …”
“Data collected during the trial period will support the pre-feasibility assessment of a commercial pilot wave farm planned for the Island of Hanimaadhoo in the Maldives.”
v important 6 months coming up for POW, imo
if they can prove up the wave technology at the demonstration wave farm (port of bunbury), then the potential for POW is huge ...
make or break time … things will certainly now start to get interesting moving forward
time to POWer on me thinks
- Forums
- ASX - By Stock
- POW
- Ann: Demonstration Wave Farm Deployment to Commence April 2016
Ann: Demonstration Wave Farm Deployment to Commence April 2016, page-2
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POW (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.204M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
POW (ASX) Chart |
Day chart unavailable