I'm an equal opportunity critic. But I won't bang on about CWE here. But pow will need to scale up. They just won't tell you that until they've milked enough money to get through the next stage or two. When they do they'll probably couch it in terms of a larger model "opening up more opportunities" or something like that.
Last time I tried to save your money and this time I am as well.
I look forward to watching the grand commissioning, when they turn on a hair dryer.
Anyways, good luck and talk again at .9c
- Forums
- ASX - By Stock
- Ann: Demonstration Wave Farm Deployment to Commence April 2016
I'm an equal opportunity critic. But I won't bang on about CWE...
-
- There are more pages in this discussion • 17 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add POW (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.204M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
POW (ASX) Chart |
Day chart unavailable