The earthquake reports almost gave me hope that the mountain sides at Bulago collapsed revealing a huge deposit
I am weary of the $6m on how it will be spent. Only because the last large influx of cash was used to purchase barges and other equipment which quickly became surplus to our operations. Almost like a kids in a candy shop wanting everything at once.
Anyway the timetable has been pushed back to around May.