so what has the ebola outbreak to do with anything regarding GPP or is this just trying to ramp another stock, I was of the belief that Morabisi is in South America and not the DRC, have you got the 2 countries mixed up, I laugh when they say the drilling contractors need a break from drilling, really??, I think this gives management an opportunity to decide if it is worthwhile continuing drilling or pack it right in and head to another area, any resemblance to lithium is 100 plus metres deep and very narrow, 7 holes out of 20 is not good and now the drillers need a 10 day break, wasnt hole 7 going to be the one that proves up Turesi, still they have another 39 kilometres of strike zone to go and I wouldnt be surprised if it was in there somewhere, all of this is IMO and GLTAH
Expand