As just @Stregazza said on the other thread; "...Going on the pattern so far, it looks as though TD-004 will be looking for confirmation of similar results as from TD-002 before slewing the drill again to an azimuth of 104 degrees and drilling TD-005 to hopefully replicate results from TD-003. All just speculation on my behalf at this stage though."
I agree with this comment.
As you can see on the drill plan, the direction of TD-004 is ame with TD-002 which no pegmatite was found. However when it was turned 90 degree on clockwise direction and drilled TD-003 they have found the pegmatite.
That tells me that TD-005 (currently being drilled) can hit another pegmatite. Then it will give a very important idea about the direction of pegmatite sheets. We will see.
As you can see on the 3D graphic of Pilbara Minerals below the pegmatites look like sheets under the ground and they go in a certain direction. You need to find out what the direction is then drill always by a 90 degree angle to that direction.
If you drill parallel to the direction of pegmatites you hit nothing.
You can also see that they hit nothing on some of the first holes, however when they change the direction and hit the pegmatites they have found the direction then all the holes hit the pegmatites and were able to define the resource.
GPP Price at posting:
1.1¢ Sentiment: Hold Disclosure: Held