A foliated hornblende granite with pegmatite stringers throughout was intersected from 33.5m to the end of the drill hole. The stringers ranged in thickness up to 100cm (down hole width). Between 39.6m and 46.0m (down hole depth) a 6.4m (down hole width) silicified pegmatite was intersected.
V's first announcement which said:
Drill hole TD 001 was completed on Wednesday 18th April (Thursday Perth time) at a total depth of 167m.The drilling rig performed to expectations with good core recovery. Drill hole TD 001 intersected saprolitic clays to a down hole depth of 36m, then granite with pegmatite stringers to the drill hole total depth.
GPP Price at posting:
1.2¢ Sentiment: None Disclosure: Held