GPP 0.00% 0.1¢ greenpower energy limited

Ann: Completion of TD 002 at the Turesi Prospect, page-6

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 1,377 Posts.
    lightbulb Created with Sketch. 92
    No mention of total depth this time ?

    A foliated hornblende granite with pegmatite stringers throughout was intersected from 33.5m to the end of the drill hole. The stringers ranged in thickness up to 100cm (down hole width). Between 39.6m and 46.0m (down hole depth) a 6.4m (down hole width) silicified pegmatite was intersected.

    V's first announcement which said:

    Drill hole TD 001 was completed on Wednesday 18th April (Thursday Perth time) at a total depth of 167m.The drilling rig performed to expectations with good core recovery. Drill hole TD 001 intersected saprolitic clays to a down hole depth of 36m, then granite with pegmatite stringers to the drill hole total depth.
 
watchlist Created with Sketch. Add GPP (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.