just realise the pfs of nachu has came out at 2014, damn im still waiting lol.
npv is about 1 billion, which is 5times of present market cap. looks great.
and we have 3 offtakes/gigafactory.
so the last issue is fully funding?
how much are we still need for capex?
- Forums
- ASX - By Stock
- Ann: Completes Investment in US Battery Technology Group C4V
just realise the pfs of nachu has came out at 2014, damn im...
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MNS (ASX) Chart |
Day chart unavailable