Two weeks from commencement of drilling to results of the first two holes. Not too shabby either, 3m@15g/t and [email protected].
With first two RC holes drilled to 250m each and 5000m of drilling suggests at least 20 holes. Plus samples sent to lab bi-weekly should ensure lots of results in the coming weeks.
This for a company of MC of $5m, (less than 100m shares) mining lic, INFRASTRUCTURE IN PLACE and a resource of 1.4mt at 5.6g/t for 300k ozs and rising.
Worth a dabble IMO.
- Forums
- ASX - By Stock
- Ann: Commencement of Drilling
Two weeks from commencement of drilling to results of the first...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add BNR (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.001(2.50%) |
Mkt cap ! $12.33M |
Open | High | Low | Value | Volume |
4.1¢ | 4.1¢ | 4.1¢ | $4.1K | 100K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 12074 | 4.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.2¢ | 200000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 0.018 |
1 | 150000 | 0.016 |
1 | 66000 | 0.012 |
1 | 1000000 | 0.008 |
1 | 500000 | 0.001 |
Price($) | Vol. | No. |
---|---|---|
0.020 | 264696 | 2 |
0.022 | 19038 | 1 |
0.023 | 100000 | 1 |
0.025 | 138333 | 2 |
0.028 | 250000 | 1 |
Last trade - 13.18pm 22/11/2024 (20 minute delay) ? |
BNR (ASX) Chart |