" it was stated that they could export "up to" 5,000 tonnes per month, or 60ktpa"
garbage.
How does 2 x 7MVA ( these are old furnaces updated from 4MVA) furnaces produce 83 tonnes of MC FeMn per day per furnace?
ie 60,000t/ 360/2 =83.3 tonnes/day
Absolutely impossible.
Do you really believe this crap you are being fed? You'll need 4 x 7MVA furnaces to produce that amount.
Obviously somebody made a booboo
You'll be lucky to produce 40 tonnes of MC FeMn per furnace /day. You cannot produce more than the capacity of the 7MVA furnace/day.
GMC Price at posting:
1.2¢ Sentiment: Sell Disclosure: Not Held