I think one of the best things about EGA is the low CAPEX requirement. Get the mill up and running for $30mill with minimal dilution and then drill the crap out of the shears using free cash flow.
I'm looking into the next wave of producers and most of the 100k+ oz hopefuls are looking at CAPEX north of $100mill due to low grades.