Wow, even the die-hards are starting to waver.
I have similar thoughts, however it will only take a break through with obtaining a consent for the Pagbilao power plant connection and then EWC will be set.
The consent for the point to point connection for the First Gen 97MW gas fired power station which started operation last year took about 10 months from the hearing in 2014 to getting consent approval...(from ERC website). This was in the pre-Duarte days...so may have required some money under the table required!!
So I think a bit more patience is required.
Anyway Mont, sure as eggs it will all happen soon after you sell....so all the waiting will be for nothing.
- Forums
- ASX - By Stock
- Ann: Change of Director's Interest Notice - Michael O'Neill
Wow, even the die-hards are starting to waver. I have similar...
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add EWC (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.0¢ |
Change
-0.003(13.0%) |
Mkt cap ! $29.24M |
Open | High | Low | Value | Volume |
2.1¢ | 2.1¢ | 1.9¢ | $15.13K | 757.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 1258505 | 1.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.1¢ | 77196 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 97 | 0.095 |
3 | 311964 | 0.094 |
1 | 300000 | 0.093 |
1 | 25000 | 0.092 |
3 | 54000 | 0.090 |
Price($) | Vol. | No. |
---|---|---|
0.096 | 20355 | 1 |
0.097 | 3101 | 1 |
0.099 | 60000 | 1 |
0.100 | 71326 | 2 |
0.105 | 220678 | 4 |
Last trade - 15.59pm 29/11/2024 (20 minute delay) ? |
EWC (ASX) Chart |