Positive confirmations starting to flow on some big issues over which doubt had been cast around this time last year .
Water supply confirmed ......tick !
Waste Dump and TSF Sterilization Drilling complete........tick !
TSF Design underway .........tick !
and the one I like the most :
Coarse Grind appears optimal which has positive implications for future operating costs compared to previous estimates
•Lewis – 92.8% total recovery at 150um grind
•Helens – 85.4% total recovery at 106um grind
- Low cyanide and lime consumption
Thank you for the detailed update .
- Forums
- ASX - By Stock
- PTN
- Ann: CGP Development Update
Ann: CGP Development Update, page-2
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)