Product storage is 9000 cubic ft. not enough at this stage. Stage capital which is expansion for existing production line. Increase capacity from 9000 to 25000 in phase 1. Phase 2 will be from 25000 to 70000 cubit ft.
CFO Price at posting:
41.5¢ Sentiment: Buy Disclosure: Held