You asked justinmetals in a previous post what could anybody else do?
The answer is drill a long lateral hole in Ooramina to get a commercial flow rate and forget PV well.
If Ooramina flows at commercial rates then make this program a big Ooramina win and drill a second lateral in it while rig there. Then long term test and go and do broker road shows to get the share price right up and do another cap raise at 20c to drill more long horizontal wells into Ooramina whole testing the first 2.
Then after second drill program share price 30c+.
Drilling a single vertical hole like the other 2 which resulted in very small flow rates in Ooramina will kill your share price and especially with another dud at PV.
That is how to do it and do it fast.
- Forums
- ASX - By Stock
- Ann: Central Signs Drilling Contract with Ensign
You asked justinmetals in a previous post what could anybody...
-
- There are more pages in this discussion • 73 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add CTP (ASX) to my watchlist
(20min delay)
|
|||||
Last
5.0¢ |
Change
-0.002(3.85%) |
Mkt cap ! $37.74M |
Open | High | Low | Value | Volume |
5.2¢ | 5.3¢ | 5.0¢ | $73.94K | 1.456M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 1481 | 5.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.5¢ | 421806 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 55500 | 0.135 |
9 | 1167237 | 0.130 |
8 | 593133 | 0.125 |
19 | 902443 | 0.120 |
1 | 86000 | 0.115 |
Price($) | Vol. | No. |
---|---|---|
0.140 | 787079 | 9 |
0.145 | 1062465 | 10 |
0.150 | 344400 | 6 |
0.160 | 125481 | 8 |
0.165 | 497623 | 5 |
Last trade - 16.10pm 29/11/2024 (20 minute delay) ? |
CTP (ASX) Chart |