If the surface sampling condirms grade and structure thickness then orebody is from surface to down point of drilling. 75 m downdip with 6-10 g/t Au i would say shallow.
It looks like smallish high grade with wider variation in grade deposit.
It may not be insignificant if you compare to Namdini. But good have to process inprove grade and recovery in the proceasing plant.
If it proves to be what it may become, 450 m x 8m x 100m = 360000 cumic meter x 2.5 = 900000 t ore x 10 g/t = 300 KOZ. Not big dent but would not hurt.
CDV Price at posting:
34.5¢ Sentiment: Hold Disclosure: Held