Its also worth considereing the drill programme and preliminary results which we all are waiting for , they are drilling 100 holes average depth of 80m per hole which = 8000m of drilling or 8km , in ground you would struggle to cover on foot , never mind getting drill rigs around , im just saying maybe give them some slack , i couldnt even envisage the problems they have faced .
- Forums
- ASX - By Stock
- Ann: Capital Raising
Its also worth considereing the drill programme and preliminary...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add MRD (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $7.784M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
MRD (ASX) Chart |
Day chart unavailable