I prefer to do my own research to verify what is being advised.
I had a previous experience where the information provided was not what was being announced.
Maybe GMC will purchase the ex KPR site and equipment. The Mn ore loading plant is still located at the Tenau Port area as indicated on Google Earth. 1000t per hour from memory.
Tenau Port actually built a purpose made Mn ore export wharf and storage area for KPR (most northern section of port) - big enough for 60,000 tonne ships.
But alas KPR stuffed.
GMC Price at posting:
4.2¢ Sentiment: None Disclosure: Not Held