Just on the international scene, there are no parameters for the size of the current proposed projects. Most if not all of our previous jobs were one offs. A lake a reservoir or some such defined body of water. That model has been super seeded. There will still be some, but a broader approach is being projected. So we see even mid-sized urban environments proposing spends of several hundred millions of dollars to fix their drinking and waste water infrastructure. Whole rivers and their drainage! Now whilst we cannot expect to be the only contractor for these fixes I have no doubt that our involvement in many of them around the globe is on the cards.
- Forums
- ASX - By Stock
- Ann: Business Update
Just on the international scene, there are no parameters for the...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Add PET (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $15.60M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
PET (ASX) Chart |
Day chart unavailable